Tel/Whatsapp : +8613799243565
Fax : 13799243565
The probability of our railway changes rail track sleepers breaking down is very low. According to customer feedback, under normal working conditions, there will be no failure.
Item NO.:
JG150LTLead Time:
15-45 daysProduct Origin:
ChinaBrand:
JingGongShipping Port:
xiamenPayment:
FOBMarket Price:
$110000Color:
yellow/ orange/ blueTel/Whatsapp : +8613799243565
Fax : 13799243565
Email : sales@fjjgjx.com
Skype : +8613799243565
Railway Changes Rail Track Sleepers With Hightech Machines
l Railway Changes Rail Track Sleepers Features:
1. The whole machine use high-quality steel, which is strong, reliable and more durable
2. Equipped with multi-way valve, hydraulic system, walking motor from South Korea, advanced and reliable
2.The boom cylinder is provided on the back of the boom. When loading sand and soil into a 2t dump truck, there is no need to worry about damage to the boom cylinder.
l Railway Changes Rail Track Sleepers Main Parameters:
(Length*width*height) travel position |
7500*2500*3500mm |
Machine weight |
13000kg |
Rated Power |
102kw |
l Certificates:
Excavator for Sleeper Laying Machine Description
In order to meet the needs of fast, safe and efficient railway transportation, the working section of each railway bureau needs to replace the failed concrete sleeper frequently to ensure the safety of driving, which is one of the important work contents of railway speed increase.
The previous way to replace the sleeper is manual work, labor intensity, slow speed, low efficiency. And power company JG80L railway sleeper changer machine, compared with other large pillow changing machine high purchase costs, short and concise, simple operation, cost-effective, greatly improve the work efficiency. JG80L can not only install the sleepers in the early stage of railway construction, but also clean the stones next to the sleepers and replace the sleepers in the later stage of construction.
Our Service
1. Top quality control Size as your request Competititve price Fast delivery time
2. Be honest, reliable and transparent in everything we do .
3. Fast lead time coz we enlarged already. Welcome to visit our factory.
SPECIFICATIONS | ||||||||||
RANGE OF OPERATION | Boom length | 4200mm | ||||||||
Arm length | 2000mm | |||||||||
Angle of rotation of The Shear | 360° | |||||||||
Max.Opening Distance of The Shear | 650mm | |||||||||
Length Of Hydraulic Shear Blade | 2-2*185mm | |||||||||
Maximum Cutting Force (in middle of blade) | 350KN | |||||||||
Maximum Lifting Height of Car Pressing Hand | 2000mm | |||||||||
Maximum Distance of Car Pressing Hand Working | 4780mm | |||||||||
DIMENSION | (Length*width*height)Transport Dimensions | 7500*2500*3500mm | ||||||||
Roller gauge | 2850mm | |||||||||
Track gauge | 1960mm | |||||||||
Width Of Crawler | 500mm | |||||||||
Ground clearance of counterweight | 940mm | |||||||||
Min ground clearance | 420mm | |||||||||
TECHNICAL PARAMETERS | Angle of rotation | 360° | ||||||||
Machine weight | 13000kg | |||||||||
Engine model | YUCHAI | |||||||||
Rated Power | 102kw | |||||||||
Rated Speed | 2200r/min | |||||||||
Hydraulic system working pressure | 28Mpa | |||||||||
Hydraulic system flow | 260L/min | |||||||||
Variable piston pump | 2*63ml/r | |||||||||
Max Hauling force | 76.5KN | |||||||||
Walking speed (High speed/Low speed) | 5/2.9km/h | |||||||||
Grade Climbing ability | 70%/35° | |||||||||
Full circle swinging time | 5s | |||||||||
Swing Overload Pressure | 25Mpa | |||||||||
Fqt Fuel Quantity | ≥8L/h | |||||||||
Capacity Of The Fuel Tank | 200L | |||||||||
Hydraulic Tank Capacity | 200L |
Scan to wechat :